Previous Next

Business cases / Overview:


    • Urgent order from a Hamburg ship repair yard


    • Express delivery of GESTRA boiler electronics


    • If quick solutions are needed: from the manufacturer straight to

       the construction site


    • Well advised on suitable sampling systems


    • Complete tank heating system delivered within 48 hours


    • Request: adapter with NPT thread made from duplex steel


    • Special construction replaces standard fitting


Yandex.Metrica