Previous Next

Business cases / Overview:

    • Urgent order from a Hamburg ship repair yard

    • Express delivery of GESTRA boiler electronics

    • If quick solutions are needed: from the manufacturer straight to

       the construction site

    • Well advised on suitable sampling systems

    • Complete tank heating system delivered within 48 hours

    • Request: adapter with NPT thread made from duplex steel

    • Special construction replaces standard fitting